Place of Origin: | Mainland China |
Brand Name: | NC8229 |
Certification: | ISO9001,CE,SGS |
Model Number: | 8229 |
Minimum Order Quantity: | 100 pcs |
---|---|
Price: | Can talk |
Packaging Details: | Wooden Case |
Delivery Time: | 30 days |
Payment Terms: | T/T, L/C |
Supply Ability: | 60,000-80,000 pcs monthly |
Item Name: | Rear Axle Housing Transmission | Application: | Tractor Part |
---|---|---|---|
Material: | Grey Iron | Manufacture Process: | Sand Casting |
Tolerance: | 0.1mm | Quality Control: | 100% Inspection |
Oem: | Available |
Grey Iron Casting Rear Axle Housing Transmission for Tractor Part
Product Description
Rear axle housing transmission refers to a part of the vehicle's drivetrain that transfers power from the engine to the wheels. It is responsible for delivering torque to the rear wheels and plays an important role in the overall performance and handling of the vehicle.
The rear axle housing transmission consists of several key components, including the differential, axle shafts, and driveshaft. The differential is responsible for transferring power between the two rear wheels, while the axle shafts connect the differential to the wheels.
The driveshaft transfers power from the transmission to the rear axle housing. It is also responsible for keeping the wheels aligned and preventing vibrations or other drive-related issues.
Rear axle housing transmissions are essential to ensuring a smooth, safe, and efficient driving experience. They are commonly found on trucks, SUVs, and other large vehicles, and come in a variety of configurations to suit different driving needs.
Proper maintenance and repair of rear axle housing transmissions are critical to ensuring their longevity and continued performance. Regularly checking fluid levels, changing damaged or worn parts, and following manufacturer recommendations can prevent costly breakdowns and keep the vehicle running smoothly for years to come.
Product Details
Production Process
We have updated our production line. Our production process include Resin Sand Molding Line, Shell Molding Line,
Wet Green Sand Casting and Lost Wax Investment Casting Production Process.
Quality Control
FAQ
A: We are manufacturer.
A: Generally it is 5-10 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to quantity.
A: Yes, we could offer the sample for free charge but do not pay the cost of freight.
Contact Person: Mr. Paul
Tel: +86-15067447509
Fax: 86-574-88923602
High Precision Investment Castings Transmission Box Cover For Power Transmission Machinery
Durable Grey Cast Iron Casting Cummins Exhaust Manifold For Diesel Engine / Cars Turbo
Customized Superior Quality Cast Iron Park Bench Legs for Outdoor Street Garden Furniture
Custom Cast Iron Hydraulic Cylinder Clevis Mount Cylinder End Mount For Truck Crane Forklift
Truck Parts Body Ductile Cast Iron Die Mold Sand Casting Process Engine Transmission Housing
CE AISI Sanding Cast Iron Brackets / Agricultural Machinery Bracket Machined Iron Casting
Bracket Hinge Precision Investment Castings Hydraulic Cylinder Mounting Brackets
Steel Investment Casting Base End Hydraulic Cylinder Yoke End / Hydraulic Cylinder Fittings
Train / Railway Precision Investment Castings Wax Lost Steel Casting Train Connecting Rod